Kiev
Destroyer · 3×2 130 mm

General characteristics
Mobility
Base concealment
Base API profile values before commander skills, upgrades and other modifiers.
Main battery
AP / SAP shell
HE shell
Torpedo armament
Anti-aircraft defense
Depth charges
Theoretical values
Before accuracy, penetration, saturation, angles and other mechanics.
About the ship
The performance specifications for a Project 48 leader, derived from Project 1 and Project 38, were approved in 1938. The draft and technical designs were approved in 1939. The lead ship, Kiev, was launched in 1940. After the Axis invasion, construction work on Kiev and Yerevan was halted. The hulls were towed to Sevastopol and then to Batumi. The ships were intended to be completed under the revised Project 48K in the post-war period, but they were eventually canceled.
Technical data imported from the public Wargaming API. For tech-tree ships, the displayed statistics use the fully researched configuration, before commander skills, upgrades, signals and other modifiers. Values may change with game updates.
