Kléber
Destroyer · 4×2 139 mm

General characteristics
Mobility
Base concealment
Base API profile values before commander skills, upgrades and other modifiers.
Main battery
AP / SAP shell
HE shell
Torpedo armament
Anti-aircraft defense
Depth charges
Theoretical values
Before accuracy, penetration, saturation, angles and other mechanics.
About the ship
After the order was made for the two leaders of the Mogador class, the new ships of this type were not laid down for several years. In 1939, it was decided to continue building the leaders due to the deteriorating international situation. The new project included enhanced AA defenses. However, the outbreak of hostilities caused the construction to be suspended and then canceled. In 1940, there was a second attempt to build four ships armed with 130 mm dual-purpose guns, but the German offensive and capitulation of France interfered with those plans.
Technical data imported from Wargaming’s public API and subject to game updates.
